George Bell House
Client: The Dean and Chapter, Chichester Cathedral
Refurbishment of an existing Grade 2 listed building within the Chichester Cathedral precinct, and conversion to provide a eight bedroom hotel and conference facility.
The work included providing new boilers and an underfloor heating system, rewiring, and a significant remodelling of the layout of the building. Each bedroom was provided with an ensuite bathroom. A commercial kitchen, a dining room, and two conference or meeting rooms were provided. The entrance hall / reception was remodelled and a new Conservatory and small extension added onto the building. The garden was re-landscaped and the exterior of the house completely redecorated and refurbished. Additional ancillary outbuildings and stores were also provided.